Luxury Villa with Panoramic Sea & Golf Views – Completion 2027, Artola Alta, Marbella
Artola, Marbella
- 5 bedrooms
- 6 bathrooms
- 671 m² built
Spectacular modern luxury villa with panoramic sea and golf views, located in the exclusive Artola Alta area of Cabopino Golf, Marbella. Currently under construction and scheduled for completion in 2027, this elegant, light-filled property is distributed over four levels and offers five en-suite bedrooms, expansive open-plan living spaces with a high-end fitted kitchen, a multi-purpose basement with garage for two cars, and a stunning solarium with jacuzzi and outdoor kitchen. The villa features landscaped gardens, large terraces, a saltwater swimming pool, and additional covered parking, all designed for privacy and outdoor enjoyment. Equipped with aerothermal climate control, underfloor heating, air conditioning, home automation, and security systems, it enjoys a prime location just minutes from the beach, Marbella town, Puerto Banús, top golf courses, and Málaga International Airport, offering a refined lifestyle on the Costa del Sol.
Features
- Aerothermics
- Air conditioning
- Alarm
- Amenities near
- Balcony
- Basement
- Brand new
- Close to children playground
- Close to port
- Close to schools
- Close to sea / beach
- Close to shops
- Close to town
- Dolby Stereo Surround system
- Electric blinds
- Excellent condition
- Fitted wardrobes
- Front line golf
- Fully fitted kitchen
- Fully furnished
- Garden view
- Golf view
- Guest toilet
- Jacuzzi
- Kitchenette
- Laundry room
- Living room
- Mountain view
- Open plan kitchen
- Panoramic view
- Parquet floors
- Pool view
- Porcelain floors
- Saltwater swimming pool
- Sea view
- Security entrance
- Smart home system
- Solarium
- Storage room
- Transport near
- Underfloor heating (throughout)
- Utility room
All details
- Reference 5757MLV
- Property Type Villa
- Bedrooms 5
- Baths 6
- En suite bathrooms 5
- Built 671 m²
- Plot 1.200 m²
- Interior 414 m²
- Terrace 257 m²
- Pool Private
- Garden Private
- Garage Private
- Year Built 2025
- Floors 4
- EPC In Progress